Sewer systems drawings / blockage

If you suspect a blockage in the connection of the house to the main sewer, you can request drawings of the sewer system at the customer contact centre (KCC) of the municipality or arrange it online.

How long does it take?

You do not have to wait long for the drawings to be ready, you can pick them at the municipality right away. 

If you arrange it online, you will receive a confirmation through e-mail (within 10 minutes) 

The sewer system drawing will be send to your through e-mail within 2 working days. 

Heeft deze informatie u geholpen?